Laserfiche WebLink
Table 1-1 <br />• Hydrology Monitoring Requirements - Lorencito Canyon Mine <br /> <br />Site Water Level <br />or Flow Field <br />Measurement' Analytical <br />List' <br />Surtace Water <br />JC-1 Q Q S <br />LC-1 Q Q S <br />LC-2 Q Q S <br />PC-1 Q Q S <br />PRGTY-1 Q Q S <br />PRGTY-2 Q Q S <br />Springs <br />PJC-1 Q Q <br />Ponds <br />PJC-1 A3 <br />Alluvial Wells <br />MWJC-1 Q Q S <br />MWLC-1 Q Q S <br />MWLC-2 Q Q S <br />MWPC-1 Q Q S <br />MWLO-W Q Q S <br />• MWLO-E Q Q S <br />KEY: Q =Quarterly (February, May, <br />August, November) <br />S =Semi-Annually (May, November) <br />A =Annually (November) <br />• <br />'See Table 1-2 for parameters included <br />in each suite. <br />ZSpring samples to be collected in August <br />'Pond Water Level to be collected in May <br />2 <br />