Laserfiche WebLink
K. Sullivan <br />DMR First Quarter 1996, COG850017 <br />Apri124, 1996 <br />Page'3 <br />since March 18, however, a leak in the head gate prompted Colowyo to continue with weekly sampling. <br />Samples were collected on March 20, and 26. By Apri15 the leaking head gate had been repaired. <br />Outfall 002A -March 26 the manual dewatering system was opened to allow water to be discharged through <br />the head gate thus ensuring pond integrity. The head gate was closed on Apri19. <br />Outfall 007A -March 23 Colowyo personnel discovered the Prospect Pond head gate was leaking. The <br />manual dewatering system was opened to assess the cause of the leak. Samples of the discharge were <br />collected and the head gate was successfully closed. <br />Please contact me at (970) 824-1531 if additional information is required. <br />Re~ctfully, <br />Kimberley A. Wolf` <br />Environmental Engineer <br /> <br /> <br />