My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP31098
DRMS
>
Back File Migration
>
Report
>
REP31098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:07:07 AM
Creation date
11/27/2007 5:49:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
9/25/2003
Doc Name
DMG Review Memo- 2nd Half 2002 Subsidence Report
From
Tom Kaldenbach
To
File
Permit Index Doc Type
Subsidence Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review Checklist for Subsidence Monitoring Report <br />Mine: Foidel Creek <br />Permit No.: C-82-056 <br />Report period: 2nd half 2002 <br />Panel(s) mined during report period: 14-Right <br />Date this review was completed: 9/25/03 <br />CDMG reviewer: Tom Kaldenbach <br />Monitoring requirement Regulation citation In compliance: <br />Yes/no? Comment <br />Installed and surveyed <br />monuments prior to 2.05.6(6)(c)(i)(A) Yes <br />underminin . <br /> Total surface strain is determined <br />Located monuments to by locating monuments at <br />detect vertical 2.05.6(6)(c)(i)(B) Yes expected points of minimum <br />subsidence and strain (over gateroads) and <br />horizontal displacement. maximum strain (over mid- <br /> anel). <br />Monitored each <br />structure's orientation, 2.05.6(6)(c)(i)(C) Yes <br />location, elevation. <br />Monitored each <br />monument and structure 2.05.6(6)(c)(i)(D) Yes <br />at least uarterly. <br /> The only renewable resource <br /> lands or structures undermined <br /> during the reporting period were <br /> the Union Pacific Railroad <br /> (UPRR), the YVEA power line, <br /> and Fish Creek. I verified the <br /> UPRR locations were surveyed <br />Commenced monitoring 500 ft. before to 1500 R. after <br />of each monument and undermining, as required in the <br />structure at least one 2.05.6(6)(c)(i)(D) Yes Permit, by checking the binder in <br />' <br />month prior to Twentymile <br />s office titled 2002 <br />underrining. Railroad Subsidence, Panel 14R. <br /> The YVEA power line and the <br /> monitoring stations were <br /> surveyed at least one month <br /> before undermining. (The power <br /> line parallels the UPRR.) Fish <br /> Creek surveys for profiles were <br /> being conducted in September <br /> 2003. <br />Submitted monitoring 2.05.6(6)(c)(i)(E) Yes <br />report semiannually. <br />
The URL can be used to link to this page
Your browser does not support the video tag.