Laserfiche WebLink
~_ , iiiiiiiiiiiiiuiii <br />~~ l~ DEPARTMENT OF NATURAL RESOURCES <br />,~,. ~_`~~: ~/ Davitl N Getches, Executive Director <br />'' -='~' MINED LAND RECLAMATION DIVISION <br />'876 ~ DAVID C. SHELTO N, Director <br />Rirh artl D. Lamm <br />Governor <br />August 9, 1985 <br />Mr. David Stout <br />Environmental Coordinator <br />12055 West Second Place <br />P.O. Box 15596 <br />Lakewood, Colorado 80215 <br />Re: Wyoming Fuel Company - Hydrologic Monitoring <br />Report, Second Quarter 1985 <br />Dear Mr. Stout: <br />The Division has completed its' review of the above referenced report. Some <br />questions arise from the data presented therein which should be addressed in <br />the annual report. These are as follows: <br />1. Why has flow not been measured at station PRS-2. Stipulation 12A of <br />the New Elk Permit requires monthly monitoring of this parameter. <br />2. The EC measurement for June at PAW-2 is significantly elevated when <br />referenced to the previous months. <br />3. The TDS measurement for February at CCAW-1 is very high compared to the <br />May measurement. <br />4. The water level measurement at ACAW-1 was not recorded for April or <br />June. This measurement is required monthly as per Stipulation 12C of <br />the New Elk permit. <br />Sincerely, <br />/~~ ~%~ <br />Jeff Deckler <br />Reclamation Specialist <br />JD/ddt <br />2548E <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (303) 866-3567 <br /> <br />