My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP31007
DRMS
>
Back File Migration
>
Report
>
REP31007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:01:30 AM
Creation date
11/27/2007 5:47:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
Report
Doc Date
5/1/1997
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112 HARD ROCK METAL & DMO ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ <br />' <br />v . ` 4 l` <br />~I ~ DENVER <br />~ ~~~ IIIII OFFICE <br />I111II111 <br /> <br /> Notice of I ntent to Cont inue Mining Operati~liE~~F <br /> 112 Hard Rock/Metal and DMO Annual Report <br />Permittee Name: Energy Fuels Nuclear Inc MAY 0 1 1997 <br />Permit No. M-77-285 <br />Operation Name: Sunday Mine <br />Anniversary Date: May O1, 1997 Division ofMinera~~s&Geology <br />Total: $550.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: 20 b. County where mine is located : 'San Miguel <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br /> Does this mine operate MORE or LESS than 180 days per year? MORE LESS <br /> For 110(2) Operations: Do you extract MORE or LESS than <br /> 70,000 tons of mineral or overburden a year? MORE LESS <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. 'Dotal acres affected during the report year:* 0 <br />S. Total acres reclaimed for the report year:° 0 <br />6. Total number of acres at topsoil replacement stage: 0 <br /> a. Average topsoil thickness replaced: 0 <br />7. Total number of acres seeded: 0 <br /> a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: 0 <br /> a. Dates reclamation began: <br />9. The type and approximate quantity of fertilizers, organic material or soil <br /> conditioners used for the report year:* Mine is on standby <br />10. Estimated total acres to be affected in the next report year:* _ <br />11. COMMENTS: <br />* Please show the location of the acreage for items 9 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, corm=_lated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** NOTE: If there have not been any changes since the last annual rep~~rt and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new mnap is unnecessary. However, this must be~7s~tated above. <br />Signature L~~-~.[,( ~ Date: OJ V ~ ~'~_ <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: Michelle R. Rehmann Phone: (303 )623-8317 <br />FAX NO: (303 )595-0930 <br />Company: Energy Fuels Nuclear, Inc. <br />Address: 1515 Arapahoe Street, Suite 900 <br />Denver, CO 80202 <br /> <br />Federal Tax ID No. or Social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.