My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP30780
DRMS
>
Back File Migration
>
Report
>
REP30780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:01:17 AM
Creation date
11/27/2007 5:44:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
10/29/1990
Doc Name
QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT NEW WEST RIDGE PILE
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman Sr.. Room 215 <br />Denver. CO 80203 <br />303 866-3567 <br />FAX. 303 8328106 <br />October 29, 1990 <br />Mr. Richard Mills <br />Cyprus Empire Corp. <br />P.0. Box 1299 <br />Paonia, CO 81428 <br />RE: Orchard Valley Mine, West Ridge Waste Pile, <br />File C-83-038 <br />Dear Mr. Mills: <br />O4 COO <br />~4'~~RyO <br />tee,>...~0 <br />~ ~R <br />Ray Romer, <br />Governor <br />Fred R Bama. <br />Dlvi5i0n Dire;br <br />In a letter to us dated August 10, 1950 you indicated that Cyprus was in the <br />process of evaluating mitigative measures for inadequate compaction at the <br />upper level of the West Ridge Waste Pile. Your letter indicates that a plan <br />would be finalized in the coming weeks. <br />Our files do not indicate that Cyprus has forwarded a plan or progress <br />report. At this time we request that a discussion and plan be submitted by <br />November 30, 1990. This plan sfroulo detail the exact location and extent of <br />material having inadequate compaction as well as a discussion of Cyprus' <br />opinion as td why compaction was not achieved. Address how the pile is to be <br />returned to the approved configuration including temporary storage of <br />excavated materials. Any alternate configuration for the pile or storage of <br />materials off the pile would have to be proposed and approved as a technical <br />revision. Copies of nuclear gauge compaction results gathered since the fall <br />of 1585 should be submitted. <br />Lastly, the Second Quarter 1990 certification report concerning the New West <br />kitlye Pile appears to be internally inconsistent. Page 2 of 2 indicates in <br />item #11 that adequate compaction was not achieved yet the certification <br />statement at the bottom of the page indicates construction was in compliance. <br />Please explain the inconsistency. <br />If you have any questions please feel free to call. <br />Sincerely, <br />Susan J. Mc'C.innon <br />Senior keclamation Specialist <br />SJM/scg <br />cc: James Pendleton <br />STATE OF COLORADO <br />110bF <br />
The URL can be used to link to this page
Your browser does not support the video tag.