Laserfiche WebLink
„ • ORCHARD VALLEY DIE • <br />OLLY Fil,b'PE DISP06AL AREA, II15PflCfION REPORT <br />NEW WFST RIDGE PILE <br />TPFSi Y/N <br />7. Top of completed fill has adequate Y Top of gob has been sloped with no soil <br />drainage cover. <br />8. Bench drainage adequate? Y No erosion. (not conq~leted) <br />9. Areas covered with 4' non-toxic non- N Covering with 4' non-toxic non-cambust- <br />oombustible material? ible material is 3/4 cong>lete. The <br /> placement of this material has been <br /> temporarily halved due to inadequate <br /> conq~action in waste material. (See No. <br /> 11 below.). <br />10. Bemis constructed on outslopes? N Type of construction has deleted the <br /> use of bents. <br />11. Evidence of structural defects? Y Construction is approximately 3/4 com- <br /> plete, soil placement on outslope has <br /> been temporarily halted due to drilling <br /> of pile to check the top 30' of pile for <br /> compaction. Results showed that some <br /> areas of pile did not meet the m;niim an <br /> rc~rn,; ramants. This necessitates re- <br /> moval of portions of the upper part of <br /> the pile. <br />12. 'Ibpsoil adequatly salvaged & stored. Y <br />13. Trash being removed? Y <br />14. Additional coirnnents? Y Compaction tests done by the nuclear <br /> gauge method. <br />Inspector: <br />John H. Menke, III, Sr. Eng. Tech. <br />Date of Inspection <br />I hereby certify the the construction of the waste disposal area during this time period was <br />done according to the above statement. <br />Date <br />