My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP30763
DRMS
>
Back File Migration
>
Report
>
REP30763
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:01:16 AM
Creation date
11/27/2007 5:43:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
5/8/2007
Doc Name
1st Quarter 2007 Review Letter
From
DRMs
To
Twentymile Coal Company
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 8663567 <br />FAX: (303) 832-8106 <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />- &- <br />SAFETY <br />Interoffice MEMORANDUM Bill Riner, Ir. <br />Governor <br />Harris D. Sherman <br />to: C-1982-056, Coal Refuse Pile Inspection Report Executive Director <br />ec: Jerry Nettleton, Twentymile Coal Company, 29515 RCR #27, Oak Creek, ~®046a7tanv <br />Brian D. Len, Northwest Colorado Consultants, Inc., 2580 Copper Ridge 1~'~y~~o~er trustee <br />Box 775226, Steamboat Springs, CO 80477 <br />from: Byron G. Walker <br />subject: Review of the 1 St Quarter 2007 Refuse Pile Inspection Report, Foidel Creek Mine, C- <br />1982-056 <br />date: May 8, 2007 <br />Table of Contents <br />Table of Contents ......................................................................... ................................................... 1 <br />Rule 4.09.1(11)(a) ........................................................................ ................................................... 1 <br />Rule 4.09.1(11)(c) ........................................................................ ................................................... 2 <br />Rule 4.10.1(1) .............................................................................. ................................................... 2 <br />Rule 4.10.1(1)(b) ........................................................................... .................................................. 2 <br />Rule 4.10.2(1) ............................................................................... .................................................. 2 <br />Rule 4.10.2(2)(a) ........................................................................... .................................................. 2 <br />Rule 4.10.2(2)(b) ........................................................................... .................................................. 3 <br />Rule 4.10.2(2)(c) ........................................................................... .................................................. 3 <br />Rule 4.10.2(2)(d) ........................................................................... .................................................. 3 <br />Rule 4.10.2(3) ............................................................................... .................................................. 3 <br />CDRMS Policy Memorandum, 7/13/84 ....................................... .................................................. 3 <br />Rule 4.09.1(1 1)(a) The fill shall be inspected for stability by a registered engineer or other <br />qualified professional specialist experienced in construction of earth and rockfill embankments <br />under the direction of a qualified professional engineer at least quarterly throughout the <br />construction and during the following critical construction periods: (!)removal of all organic <br />material and topsoil, (2)placement of underdrainage systems, (3) installation of surface drainage <br />systems, (4) placement and compaction of fill materials, and (i) revegetation. <br />The subject inspection was a quarterly inspection accomplished throughout construction, not one <br />of the critical construction periods. A registered engineer signed and stamped the report. <br />Rule 4.09.1(11)(6) The qualified registered engineer shall provide to the Division a certifed <br />report within 2 weeks after each inspection that the fill has been constructed as specified in the <br />Office of Office of <br />Mined Land Reclamation Denver • Grand lunc[ion • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.