Laserfiche WebLink
Dan Mathews - 3 - February 4, 2002 <br />2. Permanent Flood Control Dike -between the overland conveyor and the <br />river (see Permanent Flood Control Dike - TR01, Volume 7). Located in <br />SW'/4SE'/4, Section 27, Township 10 South, Range 98 West, 6'n P.M. <br />Area - 2.75 acres <br />Date -Fall 1985 <br />3. South Lease Exploration -drill pads and access roads to drill holes <br />PCC-04 through PCC-10 (see South Lease Exploration Plan - TR04, <br />MR10 and MR11, Volume 8). Located in Section 12 and 13, Township 11 <br />South, Range 98 West, 6`n P.M. <br />Area -Approximately 4 acres. <br />Date -Fall 1985 <br />4. South Lease Exploration -drill pads and access roads to drill holes <br />PCC-01 through PCC-03 and access road from Colorado Ute power line <br />to PCC-09 turnoff (see South Lease Exploration Plan - TR04, MR10 and <br />MR11, Volume 8}. Located in Section 12 and 13, Township 11 South, <br />Range 98 West, 6`n P.M. <br />Area -Approximately 3 acres. <br />Date -Spring 1986 <br />5. North Decline -Portal, water treatment and storage areas (see TR14). <br />Located in the N%ZNE%,, Section 34 and the NW%<NW'/<, Section 35, <br />Township 10 South, Range 98 West, 6`n P.M. <br />Area - 18.3 acres <br />Date -Fall 1992 <br />6. North Decline -treatment building, A-substation and power line between <br />A and A-substations. Located in E'/ONE'/4 and NE'/4SE'/<, Section 34, <br />Township 10 South, Range 98 West, 6`n P.M. <br />Area - 0.1 acres <br />Date -Spring 1993 <br />7. NW Intake Portal - Backfill portal located in NW'/4NE'/<, Section 34, <br />Township 10 South, Range 98 West, 6`n P.M. <br />Area - 0.1 acres <br />Date -Summer 1993 <br />8. Cameo Refuse Disposal Area No. 1 -Covered benches 1, 2, and 3. <br />Located in the SE'/4 Section 28, Township 10 South, Range 98 West, 6tn <br />P.M. <br />Area - 9.6 acres <br />Date -.July 1994 <br />