Laserfiche WebLink
• <br />STATE OF <br />MINED LAND RECLAMATION DIVISION <br />. <br />Department of Natural Resources of ~o~ <br />e~q <br /> a <br />~ <br />t 313 Sherman St.. Room 215 <br />Denver, CO 80203 ~, ~j : ~ ~$ <br />'~~' <br />303 8663567 g 6 <br />FA x: 303 832-8106 r <br />Roy Ramer. <br />Gavemor <br />Fretl R. Banta. <br />Division Director <br />December 11, 1990 <br />Mr. 8 Mrs. Orlando Martinez <br />1 Kiowa <br />Pueblo, Colorado 81006 <br />Re: Leone-Gardner Gravel, Successiun Approval <br />Permit No. M-85-008, Revision No. SO-02 <br />Dear tdr. 8 Mrs. Martinez: <br />On December 6, 1990 the Colorado tdined Land Reclamation Board ap roved the <br />succession of operators from Huerfano Peak Sand 8 Gravel to Orla do 8 Rose <br />Marie Martinez for this operation. Orlando & Rose Marie Martine is now the <br />permitted operator of the Leone-Gardner Gravel, and as such, is esponsible <br />for all provisions in Permit Vo. M-85-008, as well as those spec fied in the <br />Minerals Rules and Regulations. Huerfano Peak Sand 8 Gravel is elieved of <br />all responsibilities concerning this operation (See Mineral Rule and <br />Regulations Number 1.7 ). <br />The Division would like to remind you, as the permitted operator, about a few <br />things we feel are important: <br />1. All of the application materials, as amended and suppleme ted, are an <br />integral part of your permit. They have been incorporated into he permit by <br />reference. We presume that you have a copy of all of these mate ials; <br />therefore, none have been enclosed with this mailing. We sugges that you <br />keep a copy of the permit and the permit application at the mini g operation <br />as a reference for operating personnel, to help ensure compliant with the <br />terms of the permit. <br />2. Changes in the mining and reclamation operations that dif~er from those <br />described in the permit may require a revision to the permit. W suggest <br />consulting the Mineral Rules and Regulations and/or contacting u to determine <br />if a revision to the permit is necessary. Rule 1.8 pertains to amendments, <br />Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />