Laserfiche WebLink
~- C <br />BATTLE MOUNTAIN RESOURCES, ANC. (NAY 17 1g94 <br />May 9, 1994 <br />Mr. Larry Oehler <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />L'r'na~ur~ a ,„~~It,~„ 3 ~rao9Y <br />Re: Battle Mountain Resources, <br />DMG Permit No. M-88-112 <br />Phase II, Raise 1 Tailings <br />Certification Report <br />Dear Mr. Oehler: <br />i <br />9HTLE MOUNWN <br />D COMPANY <br />Inc. (BMRI) - San Luis <br />Disposal Area Construction <br />Enclosed with this letter are three copies of the <br />certification report for the Phase II, Raise 1 tailinggs <br />disposal area construction project. The certification report <br />is submitted to the Division in accordance with Section 7.7 of <br />the Earthwork Specifications and Section 4.2.12.6 of the Liner <br />Specifications. <br />BMRI requests that review of the certification report be <br />handled in a timely manner as the Phase II expansion urea will <br />be needed to meet freeboard requirements for the faci:Lity in <br />mid-1994. Tailings deposition in the expansion area :Ls <br />scheduled to begin during third quarter 1994. <br />If you have any questions, please call. <br />Sincerely, <br />~1~CQ/14 ~ ~`-`~' <br />Alana L. Scott <br />Technical Superintendent <br />Enclosure <br />cc: Anne Baldrige <br />Dan Robertson <br />Clint Strachan <br />A SUBSlD/ARY OP BAT/ I}' MOUKfAlN GOLD COMPAA'Y <br />P.V. BOX 310 SAN LUIS. COLORALb 81152~031U (719) 672-336? FAX (719) 672-3363 <br />