Laserfiche WebLink
<br />July 16, 1999 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />iii iiiiiiiiiiiiiiii <br />999 <br />- San Luis Project <br />Attached is a su ary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of July 11, <br />1999 - July 17, 1999 as required by the approved TR-010. <br />Re: Battle Mountain Resources, Inc. <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />July 11, 1999 -~July~17, 1999 <br />Dear Mr. Dillie: <br />During the week, the tailings pond averaged 0.089 ppm CN-wad and 0.743 <br />ppm CN-total. The collection pond averaged 0.023 ppm CN-wad and 0.033 <br />ppm CN-total. <br />Sincerely, <br />LYi <br />Ron OZurt~ t <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />