Laserfiche WebLink
<br />;k>1?!?r <br />3.2 Reclamation of Disturbed Areas Summary <br />As the Yankee Gulch project developed from the test mine phase in 1997 through the <br />construction and operation of the commercial phase (2000-2007) a number of areas <br />have been disturbed and reclaimed. A summary of the disturbed and reclaimed areas <br />and the present status of these areas are included in Table 1 below. <br />TABLE 1 <br />DISTURBED AND RECLAIMED AREAS WITHIN DIVISION OF RECLAMATION. <br />MINING AND SAFETY PERMIT BOUNDARY <br />~ AREA DETAIL DISTURBED AREA CURRENT STATUS <br />ACRES/YEAR _ <br />Piceance Malor processing I - ~-~ Sold :o EnCana O:1 and Gas <br />Site edu:pment, ronirof room. Soptember 2005 WWII be <br />Processing admen efirces, manvenonce addressed in 112 Pplmil <br />shop. heliport. sepbr, leach 11.8 2000 Amendment I. Areas aU in <br />FBCitity field, topsoil pile electrir.ai use - American Srxla <br />sutrytat,on ~ j reclaimed 0 5 acres in 2001 <br />Evaporation 'Six fool deep one acre lined ~ tl Sold :a EnCarw Od and Gas <br />Pond ~ Pond northwest o! the September 201)5 1N~U be <br />processing lacility 20 2000 addresseC in 112 Permit <br />~ ~ Amendment I PonC in use - <br />I No Reclamation <br />Ar~,ia,c~~~ ~ x;:i:.r : t ~ 5 <br />DRV:S Anrnrar Report <br />Jury 12. 2007 <br />Phoro 3 - Dlsposa! cell for test mine solids constructed on ridge top near prcxiucNOn Wel! <br />2006. <br />