Laserfiche WebLink
2.0 PERMIT MODIFICATIONS <br />During the current reporting period, July 13, 2006 -July 12, 2007, American Soda did <br />not submit any Amendments or requests for Technical Revision to 112 Permit No. M- <br />1999-002. <br />Work is currently in progress on the first Amendment to the original 112 permit to <br />address the already completed sale of the American Soda Processing Facility, main <br />access road, storm water pond, septic leach field, electrical substation and heliport. <br />These American Soda assets were sold in September 2005 to a natural gas company <br />that is currently constructing a natural gas processing plant in the area which includes <br />the temporary lay down yard, construction parking area and proposed evaporation pond <br />site all previously disturbed and reclaimed by American Soda. The natural gas <br />company has bonded with the Bureau of Land Management (BLM) for reclamation of <br />these sites. The 112 permit amendment will address these changes and will be <br />submitted early in the next reporting period. <br />American Soda, L.L.P. <br />DRMS Annual Report <br />July 12, 2007 <br />