Laserfiche WebLink
III IIIIIIIIIIIII III <br />August O1, 1997 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. <br />DMG Permit No. M-88-112, TR-010 <br />weekly Pond Compliance Report <br />July 27 - August 02 <br />Dear Mr. Dillie: <br />- San Luis Project <br />Attached is a summary of the cyanide analysis performed by Sangre De <br />Cristo Lab on samples from the tailings pond and the collection pond <br />during the week of July 27 - August 02, 1997 as required by the approved <br />TR-010. <br />During the week, the tailings pond averaged <0.010 ppm CN-wad and 0.05 <br />ppm CN-total. The collection pond averaged 0.48 ppm CN-wad acid 0.51 ppm <br />CN-total. <br />`Sincerely, <br />I \ P'i'1 <br />Ron Zumwalt <br />cc: Bill Lyle <br />Dan Robertson <br />