Laserfiche WebLink
<br />TABLE 1 <br />Southfield Mine <br />SEMI-ANNUAL SUBSIDENCE MONTTORING DATA SUMMARY <br />PERIOD: JANUARY I THROUGH JUNE 30, 2001 <br />FLORENCE WATER LINE <br />Original Survey Dates: 05!65, 10/87, 01195, 05!96 <br />Previous Survey Date: 04/01 <br />La[est Survey Date: 06/01 <br />Change from Original Survey (feet) Change from Previous Survey (feet) <br />Monument Latest Survey Vertical Horizontal Previous Survey Vertical Horizontal <br />No. Elevation Chan a Chan a Elevation Chan a Chan e <br />B 6,431.69 -0.31 0.75 6,432.00 -0.31 0.11 <br />C 6,477.35 -0.78 1.26 6,477.65 -0.30 0.12 <br />__ <br />D 6,553.45 ___ <br />-1.02 __ <br />_ <br />0.20 __ <br />__ <br />6,553.75 _ <br />-0.30 __ <br />0.15 <br />E 6,631.34 -2.29 1.86 6,631.66 -0.32 0.16 <br />F 6,296.55 -2.35 0.65 ___ <br />__ <br />6,296.85 -0.30 0.06 <br />G 6,261.30 -3.25 0.74 6,261.50 -0.20 0.01 <br />H 6,238.97 -1.31 0.35 6,239.02 -0.05 0.06 <br />I 6,206.08 -3.23 0.63 6,206.11 -0.03 0.07 <br />CV Joint 6,258.60 -2.99 _ <br />_ <br />0.20 _ <br />_ <br />6,258.93 -0.33 _ <br />0.05 <br />THOMPSON RANCH STRUCTURES <br />Original Survey Date: 05165 <br />Previous Survey Dete: 04!01 <br />Latest Survey Date: 06101 <br />Change from Original Survey (feet) Change from Previous Survey (feet) <br /> Latest Survey Vertical Horizontal Previous Survey Vertical Horizontal <br />Structure Elevation Chan a Chan a Elevation Chan a Chan e <br />N. House 6,367.03 -0.32 0.28 6,367.38 -0.35 0.21 <br />S. House 6,371.69 -0.25 0.22 6,372.01 -0.32 0.12 <br />Bam 6,383.12 -0.28 0.01 6,383.43 -0.31 0.13 <br />NEWLW CREEK POINT <br />Original Survey Date: 05/65, 12196 <br />Previous Survey Date: 04101 <br />Latest Survey Date: 06/07 <br />Change from Original Survey (feet) <br />Latest Survey Vertical Horizontal <br />Elevation Change Change <br />Change from Previous Survey (feet) <br />Previous Survey Vertical Horizontal <br />Point 6,221.67______-0.31 0.12 ~ 6,221.76 -0.09 0.08 ~ <br />