Laserfiche WebLink
<br />0ctc~ber02, 1998 <br />Mr. _im Dillie <br />Divis on of Minerals and Geology <br />131: Sherman Street, Room 215 <br />Denier. Colorado 80203 <br />RECEIVED <br />OCT 5 1998 <br />DIV. OF MINERALS <br />Sub ect: Battle Mountain Resources, Inc. -San Luis Project <br />DMG Permit No. M-88-1 12 <br />Monthly Pond Compliance Report -September 1998 <br />Dea Mr. Dillie: <br />Attcched is the September, 1998 monthly summary of cyanide analysis performed on <br />samples from the tailings pond and the collection pond as required. TR-O10 specifies a <br />simF le monthly average for regulating pond compliance. The September averages are as <br />folloNS: <br />Tailings Pond 0.02 ppm CN-wad, 0.24 ppm CN-total. Collection Pond 0.01 ppm CN-wad, <br />0.03 ppm CN-total. <br />Sinc rely, <br />`C ~1 ~u~lti~~. <br />on 2u walt <br />Enclosures <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />