Laserfiche WebLink
.~ <br />c <br />Ms. Susan Burgmaier <br />Page 2 <br />6. Crusher Pit <br />The crusher pit floor and drain have been cleaned and the roof has been <br />repaired. <br />I have enclosed a copy of an October 7, 1993 letter terminating the Eilts' lease <br />and a November 9, 1993 letter answering complaints. <br />Sincerely, <br />~!;5~~~y~s~~ll~l~/Ii <br />Bryan J. Archer <br />Manager, Sun Coal Company <br />~.1P <br />Enclosures <br />