Laserfiche WebLink
lI~FtL ~ i <br />PORTLAND QUARRY PERMIT <br />77-344 2 <br />(5) The tyQe and approximate quantity of fertilizers <br />organic material or so <br />location o use. <br />Not applicable at this time. <br />(6) Ana raisal of the success of reclamation efforts, <br />an in t e event o ai ure o an a orts, a short <br />narrative on t e sus ecte or etermine causes o <br />suc ai ure. <br />Not applicable at this time. <br />(7) Estimates of the location and number of acres to be <br />a ecte in t e coming year. <br />Outlined in yellow is actually three to four years <br />of future operating area and comprises 75 acres, <br />located as follows: <br />Cut 2--the same 36 acres designated under (1) will <br />coco-n~ue as operating area. <br />Cut 3--the 30 acres outlined as Cut 3 includes topsoil <br />storage south of Highway 50. <br />Cut 1--Nine acres outlined includes about 400 feet <br />~t 1 and topsoil storage south of Highway 50. <br />(8) The effective date of the information <br />is approximate y eptem er. <br />Signed ,~~r ~~~~,,~/!1 <br />R. E. Marsh <br />Properties Manager <br />above <br />