Laserfiche WebLink
August 21, 2007 <br />Annual Report <br />LAKE COUNTY <br />Public Works <br />1200 Hazel Street <br />Leadville, CO 80461 <br />Phone: 71986-0259 <br />Fax: 719-486-8479 <br />Division of Minerals and Geology, <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Re: Permit No. M-1977-459 <br />Lake County Gravel Pit <br />Anniversary Date: July 8, 2007 <br />~~ <br />t'R ~qR~^qc,9 <br />' ~" ~. <br />,. <br />~<i , Wog` <br />~~~r~\/G(') <br />AUG 2 7 2007 " <br />u;~,:,;~;~ ci Reclamation, <br />/ Mininy and Safety <br />~~s'' <br />P^"rv<''9' D~ <br />Gentlemen; / <br />Enclosed, please find the payment of $103.00 for the additional annual fee for the above <br />referenced permit. <br />The activity in the calendar year 2006 consisted of mining and crushing approximately 12,500 <br />tons of road base material during the time period January 1, 2006 to December 31, 2006. The <br />material mined consisted of taking down material on existing disturbed areas as shown on <br />enclosed map and cutting down the slope on the south east side of the piton disturbed soil. <br />Approximately 200'x50' of new area was disturbed. The new area had less than 2" of top soil <br />material, which was pushed back south and east from disturbed pit area. <br />Recamation for the year 2006 consisted of stockpiling existing top soil from the pit area to the <br />east side of the pit. Also in 2006 we have continued a program of stockpiling top soil from <br />outside sources, such as new road construction around town in anticipation of future <br />recamation work. <br />New disturbances for the year 2006 include stockpiling all salvageable top soil at the top east <br />side of the pit in order to maintain and fake down the grade of the pit Also, to continue to <br />accumulate topsoil from outside sources. It is expected that any new disturbance will be <br />located in the south east comer of the existing pit area. Production for the calendar year <br />January 1, 2007 through December 31, 2007 will be between 10,000 and 15,000 tons of road <br />base material. <br />Please r~ntact Brad Palmer ublic Works Director at 719j1ti6-0259 should you have any <br />questions. <br />Sincerely, I / <br /> <br />Brad Palmer, Director ' " <br />Lake County Public Works <br />