Laserfiche WebLink
AI~INI~A`L F~EP~~2T • <br />PNST.R[IGT~pNS , <br />According to C.R.S. 34-32-I 16(3), and C.R.S. 34-32.5-I 16(3)ia), on the anniversary date of the permit each year. <br />the operator shall submit a report and a map showing the extent of current disturbances to affected land. <br />reclamauon accomplished to dale and during the preceding year, new disturbances that are anticipated to occur <br />during the upcoming year, and reclamation that will be performed durin~~ the upcoming year. Please attach such <br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes <br />the above elements may suffice for a written report.) <br />IF your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the Annual Report the following information as required by 2 CCR 407-I, 407-4, and Rules <br />1.13.7(1)(a): <br />(i) [he condition of the operation a[ the time of cessation; <br />-- - - (ii) what specific measures Bove bezn and will be implemeh[ed to comply with reclamation, performance <br />standards and Environmental Protection Plan requirements, if they are pan of your approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following information with your Annual Report, as applicable: <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.150), provide an updated statement <br />regarding the sufficiency of the value of the Financial Warranty, specifically: <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(a), provide an updated <br />statement regarding the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, b}' a qualified <br />independent appraiser, indicating any changes in property value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security agreement, <br />and the value of the properly subject to either of these instruments. The report shall also provide <br />_ _ _ ,proof that there are no oast-due_property_ta_xes. _ . _.. _ __ _ _ ._. ~..-_~ ~_~ - <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certified by a Cettified Public Accountant, demonstrating that the Letter of <br />Credit does not exceed ten percent (1090) of the bank's capital surplus accounts. <br />(ii) Per [he requirements of 2 CCR 407-1.407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully describe the condition, value, and location of all pledged fixtures and equipment. <br />(b) Per the requirements of 2 CCR 407-I, 407-4, and Rules 1.15(1)(c), all monitoring information <br />required as part of [he approved permit application, to include the Environmental Protection Plan. fPleas'e <br />note that if you are not a Designated Mining Operation, you will not have an Environmental Protection <br />Plan as pan of your approved permit.) <br />