My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP30003
DRMS
>
Back File Migration
>
Report
>
REP30003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:00:27 AM
Creation date
11/27/2007 5:31:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
12/6/1993
Doc Name
FAX COVER
From
WATER WASTE & LAND
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC - b- 9 3 M O N 1 7 4 3 <br />Larry Oehlsr • <br />Dewmber e, 1993 <br />Ppe2 <br />W A T E R W A S T E~ L A N D <br />• <br />P _ 0 3 <br />• Embankment Conatructlon <br />i <br />At the end of this work period, approximately 40 percent of the 8597 (approximat ) etevatlon <br />lift had been placed. On Wednesday, December 1, SRK's field representative instructed BMRI <br />to abandon its embankment material borrow area and change to a new location sielected by <br />SRK. Both borrow material locations are in the mine pit area. <br />The existing borrow erea could no longer provide suitable materials. The new borrow area is <br />much closer to the original ground surface, significantly less consolidated (o blasting <br />required), and has fewer fines and more sand and gravel. The only potential probl~m with the <br />new borrow area is the depth to which frost had been driven by construction trq~ffic. More <br />effort and thinner lifts have been required during compaction to allow the CAT to break up this <br />material. ' <br />Measured field densities continue to be achieved throughout each lift. Previous lifts are being <br />scarified prior to placement of successive lifts. <br />On Wednesday, December 1, the day and night shifts had to rework approximately 1000 feet <br />of the previous lift to ensure that oversized materials were being broken apart an4nixed with <br />the remaining materials. <br />There was no embankment construction on Sunday or Monday (November 28 or1291 during <br />the day shifts. <br />QUALITY ASSURANCE TESTINQ AND REVIEW <br />• Liner Cover <br />On Wednesday, December 1, I dug one hole in Acre 36 to verify the thickness of liner cover <br />attar placement. I chose an erea which appeared to be thin from observation on the previous <br />day. It appeared to me that the CAT operator was anxious to finish placement. bf the Type <br />2 material. In the hole I dug, the material was 18 inches thick. I infor~ed SRK's <br />representative and he instructed the contractor to place an additional six inches'of material <br />over an area yet to be determined. SRK informed me that they would verify th~e~liner cover <br />thickness by testing in random Iocations~This,has not yet beer done. <br />After being present during placement of a considerable quantity of the liner cover, I believe <br />the areas with less than 24 inches of cover are rather isolated and may total approximately <br />two acres in aggregate. <br />Miscellaneous Isaues <br />Several times 1 have been able to point out potential problems to SRK personnel b6fore these <br />areas have been covered by the next phase of construction. Although these potential <br />problems may have bean minor in the overall function of the facility, I believe that it was in <br />everyone's interest that they be addressed quickly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.