My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP29970
DRMS
>
Back File Migration
>
Report
>
REP29970
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:00:25 AM
Creation date
11/27/2007 5:30:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Report
Doc Date
6/6/1996
Doc Name
1995 AHR REVIEW MUNGER & MCCLANE MINES FN C-81-020 & C-80-004
From
DMG
To
GRAND VALLEY COAL CO
Annual Report Year
1995
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1713 Sherman 51.. Room 215 <br />Denver, Colorado 80203 <br />Phone: 13031 866 3567 <br />FAX~13031872-8106 <br />DATE: January 31, 1996 <br />TO: Barbara Pavlik // <br />FROM: Dan Mathews L -J/~/~ <br />RE: McClane and Munger 1995 AAR's <br />File No. C-80-004 (McClane), and C-81-020 (Munger) <br />~I~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames 5 cxhhead <br />Ececmive Oirectar <br />Michael B. Long <br />Division Dneaor <br />I have conducted a preliminary review of the referenced AHR's <br />(enclosed), and verified that monitoring frequency for the various <br />surface and ground water sites was conducted in compliance with the <br />required schedule, and required parameters were analyzed. I am <br />requesting your review of the report with regard to whether the <br />monitoring indicates that observed effects are in accordance with <br />PHC projections. <br />Note that data for well GW-3 was reported <br />anticipation of submittal of a TR to substitut <br />which would be dropped from the monitoring plan. <br />Well GW-6 was dry all year, as it has been since <br />several years ago. I believe the original intent <br />to document baseline conditions at the proposed <br />site prior to initiation of waste disposal. Is <br />for continued monitoring of this dry well, <br />discontinued until refuse disposal is initiated? <br />Let me know if you have any questions. <br />Thanks. <br />this year, in <br />e GW-3 for GW-4, <br />Also note that <br />it was installed <br />of this well was <br />refuse disposal <br />there any reason <br />or could it be <br />me\95mcmnhr.mem <br />
The URL can be used to link to this page
Your browser does not support the video tag.