Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman SL, Room 215 C O L A RA D O <br />Denver, Colorado 80203 DIVISION O F <br />Phone: (303) 866-3567 MINERAL S <br />FAX: (303) 832-8106 G E O L O G Y <br /> 0.ECLAMATION•MINING <br /> SAFETY•SQENCE <br />interoffice Bill Owens <br />Governor <br />MEMORANDUM Russell George <br />Executive Director <br />to: File C-81-019 Colowyo Coal Mine, West Pit Fill Inspection Report, 2"d i~P2'r~"~ny <br />2005 Division Director <br />Natural Resource Trustee <br />from: Byron G. Walker <br />subject: Review for Compliance <br />date: July 14, 2005 <br />Rule 4.09.1(1 l) Inspection <br />Rule 4.09.1(11)(a) The fill shall be inspected for stability by a registered engineer or other <br />qualified professional specialist experienced in construction of earth and rockfill embankments <br />under the direction of a qualified professional engineer at least quarterly' throughout the <br />construction and during the following critical construction periods2: (1)removal of all organic <br />material and topsoil, (2)placement of underdrainage systems, (3) installation of surface drainage <br />systems, (4) placement and compaction of fill materials, and (5) revegetation. <br />The permittee is in compliance with this rule. 1 This is a quarterly report. A registered engineer <br />accomplished both the inspection and certification. 2 No critical construction period was <br />encountered during this period. A requirement to complete a surface drain was noted. <br />Rule 4.09.1(11)(b) The qualified registered engineer shall provide to the Division a certified <br />report within 2 weeks after each inspection I that the fall has been constructed as specified in the <br />design approved by the Division. 2The report shall include a description of any appearances of <br />instability, structural weakness, and other hazardous conditions observed during the inspection. <br />A copy of the report shall be retained at the mine site. <br />The certification indicates that the ftll was inspected on May 25, 2005. The report was to be <br />provided to the Division by June 8, 2005 (within two weeks after the inspection, PAP, Exhibit <br />19, Section I, page Ia-4). The report was submitted on a letter of June 3, 2005 and received at the <br />Division on June 3, 2005. 2 The report included observations on instability, structural weakness <br />and other hazardous conditions. There were no problems with the fill. <br />files: C-1981-019 West Pit Fill Reports <br />C:\bgw\My Documents\Colowyo\inspectionsMill insp\wp fill insp rpt 2q5 rvw.doc <br />Office of Office of Colorado <br />Mined Land Reclamation Active and InaRive Mines Geological Survey <br />