Laserfiche WebLink
Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year 2003 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed <br />upon by the Division. It should include text, discussion, and maps, at a minimum, in addition to any <br />other reclamation monitoring data as required by the approved permit. The location of all of the <br />areas reported should be clearly depicted on a map included with the report. <br />Mine Name: New Horizon Mine Permit Number: C-81-008 <br />Permittee: Western Fuels Colorado, LLC Address: P.O. Box 628 / 27646 W. 5`" St <br />Nucla, CO 81424 <br />For work accomplished this calendar year only <br />Total number of acres disturbed: 40.11 <br />Total number of acres backfilled and graded: 17.35 <br />Total number of acres topsoiled: 6.11 <br />• Total number of acres permanently seeded or planted: 5.09* <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For previous Years <br />Total number of acres previously re-seeded: 52.04 in NH1 during 1995 <br />(Indicated on a map acreage and date of seeding for individual, previously re-seeded areas) <br />Please see map 2003-2 of the 2001 Annual Reclamation Report for the location of the re-seeded <br />areas <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities' : 44.76 <br />Acreage in active mining areas s 99.27 <br />Acreage re-seeded for greater than 10 years : 0 <br />'Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; <br />diversion and collector ditches, water and air monitoring sites, topsoil stockpiles, overburden stockpiles, repair, <br />storage and construction areas; office area, repair shops, and parking; coal stockpiles, loading, and <br />processing areas; railroads; coal conveyors; refuse piles and coal mine waste impoundments; head-of-hollow <br />fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area (garbage dumps and coal <br />combustion by-products disposal areas). <br />z Includes pits, topsoil stripped area in advance of pits, and spoil not backfilled and graded <br />(F:\eng\data\word\ann reclaim rpt\2003recrepo.doc) <br />