Laserfiche WebLink
<br />CF&I STEEL CORPORATION <br />Canon Dolomite Quarry <br />ANNUAL REPORT - MLR <br />9/82 - 9/83 <br />(1) CF&.I did not operate the Canon Dolomite Quarry <br /> during the September 1982-September 1983 report <br /> period and no acres (new or disturbed) were affected. <br />(2)-(6) No reclamation was performed during the mining year. <br /> The approved Quarry permit defers all reclamation <br /> until the completion of mining at the quarry. <br />(7) Due to the continued low demand for steel from the <br /> Pueblo Plant, CF&.I does not anticipate operating the <br /> Quarry during the September 1983 through September <br /> 1984 mining period. <br />Since there is no effected; reclaimed, or planned activity <br />acreage for the period; a ma.p is not being submitted with this <br />report. <br />The Divisio n will be advised, should the status of the temporary <br />suspension of quarry activity change. <br />9-20-83 <br />