My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP29785
DRMS
>
Back File Migration
>
Report
>
REP29785
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:00:15 AM
Creation date
11/27/2007 5:27:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982020
IBM Index Class Name
Report
Doc Date
5/15/2000
Doc Name
ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANNUAL REPORT • <br />INSTRUCTIONS <br />Accordins to C.R.S. 34-33-I 16(3), and C.R.S. 34-325-I 16(3)(x), on the anniversary date of the permit each year. <br />the operator :hall submit a repots and a map showing the extent of current disturbances to affected land. <br />redama[ion accomplished to date and during the preceding year, new disturbances that are anticipated to occur <br />during the upcoming year, and reclamation that will be performed Burins'the upcomine year. Phase attach such <br />a report and map to enclosed annual report Form. (An adequately labeled map that clearly delineates and includes <br />the above elements may suffice for a written repart.) <br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules. you must <br />provide with the Annual Report the following information as required by 2 CCR 407-1, 407-4, and Rules <br />1.13.7(1)(a): <br />(i} the condition of the operation at the time of cessation; <br />(ii) what specific measures have been and will be implemented to comply with reclamation, performance <br />standards and Environmental Protection Plan requirements, if [hey are part of your approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following information with your Annual Report, as applicable: <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement <br />regarding the sufficiency of the value of the Financial Warranty, specifically: <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules I.15(1)(a), provide att updated <br />statement regazding the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15{1)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update_by a qualified y _ <br />--- _ _.~_ . - ----independent app~azse%indicatin; anany chaiges in property value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security agreement, <br />and the value of the property subject to either of these instruments. The report shall also provide <br />_ _ _ _ -_ _ .proof that there are no past. due property taxes. _ ___ _ __ _ . _ _ - _ ~-. -- _ _ _ -- <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3). pemtits secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the farm <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of <br />Credit does not exceed ten percent (10%a) of the bank's capital surplus accounts. <br />(ii) Per the requirements of 2 CCR 407-I, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail [o fully describe the condition, value, and location of all pledged fixtures and equipment. <br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(c), all monitoring information <br />required as part of the approved permit application, [o include the Environmental Protection Plan. (Please <br />note that if you are not a Designated Ivfining Operation, you will not have an Environmental Protection <br />Plan as pan of your approved permit.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.