Laserfiche WebLink
<br />ig43 <br />ORCHARD VALLEY MINE <br />3rd. QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT <br />NEW WEST RIDGE PILE <br />Item Y/N Comments <br />1. Quantity of waste material added to Y Approtdmately 10,416 tons of gob were added to [he <br />waste disposal area this quarter? waste disposal pile this quarter. <br />2. Waste material deposited and compacted Y <br />in 24' lifts? <br />3. Drainage alterations constructed? N No drainage alterations were constructed during the <br /> the quarter. The e~dsting drainage pattern was <br /> maintained around the perimeter of the pile to protect <br /> outslopes and direct drainage to ditches at the toe of <br /> the pile. <br />4. Present height of waste material? Highest height appro~dma[ely 94.0 feet. <br />5. New bench constructed? N <br />6. Refuse material outslope placed at Y Slopes were checked for proper placement periodically <br />1V:2H autslope? during construction. <br />7. Adequate drainage on top of completed Y Grading was maintained on top of completed fill lilts to <br />fill? ensure proper drainage from the top of the pile. <br />8. Bench drainage adequate? Y Bench drainage was maintained throughout the quarter. <br /> See item 3. <br />9. Outslopes covered with 4' non-to>ac, Y <br />non-combustible material? <br />10. Berms constructed on outslopes? Y <br />11. Evidence of structural defects? N <br />