My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP29704
DRMS
>
Back File Migration
>
Report
>
REP29704
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:00:10 AM
Creation date
11/27/2007 5:25:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Report
Doc Date
2/16/2000
Doc Name
1999 AHR Tables
Annual Report Year
1999
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~. <br />TABLE 1 (Continued) <br />HYDROLOGIC MONITORING SITES <br />S[JRFACE WATER SITES <br />SITE MONITORING FREQUENCY COMMENTS <br />Water Level or Water Quality <br />Flow & Field Sampling <br />Parameters <br />Foidel Creek <br />USGS 09243800 Monthly Quarterl}' 1 I 1 .~ (21 <br />14 Monthly Quarterly 13~ <br />8 Monthly Quarterly 11) ~ i?) <br />USGS 09243900 Monthly Quarterly (2) <br />Middle Creek <br />USGS 09243700 Monthly Quarterly (2) <br />Fish Creek <br />• <br />16 Monthly Quarterly (1) & (2) <br />302 Monthly Monthly During irrigation <br /> season only; (1) & (4) <br />1002 Monthly Quarterly (1) & (2) <br />Trout Creek <br />301 Monthly Monthly During irrigation <br />season only; (1) & (4) <br />69 Monthly Monthly During irrigation <br />season only; (1) 8e (4) <br />NOTES: <br />(1) Included with Twenlymile Coal Company's hydrologic moniwring program. If'sitc is remu+cd from <br />TCC's program and continued monitoring is requireJ, CYCC will monitor site. <br />(2) Sampling wJl be performed on a flexible schedule throughout normal tlo+r pcriuJ, March through <br />September. Within this lime fume, flow and field parameters will be measured hachr tiuu•s and four <br />full suite analyses will be conducted. <br />(3) Monthly field samples when flowing; Four monthly lab samples obtained once runoff begins. <br />(4) First headgate of irrigation ditch downstream of mine discharge. Monitoring to begin once Fish Creek <br />Dewatering Facility u functioning. <br />• <br />I \ENIEN VIRONMEtJTAL\AHI2\1999\CY VC\SPECIALXLS <br />.~aiuSrTb3i}' •i ~J~FY4:a~TLKi.M9R'~~J..ti~~-~-` "h..' -.~"~~v~- ~'~°'~-'~'%a:"''ss~h~.' <br />
The URL can be used to link to this page
Your browser does not support the video tag.