Laserfiche WebLink
Richartl D. Lamm <br />Governor <br />iii iiiiiiiiiiiii tii <br /> <br />DEPARTMENT OF NATURAL RESOURCES <br />David H. Getches, Executive Director <br />MINED LAND RECLAMATION DI\ <br />DAVID C. SHELTON, Director <br />DATE: November 22, 1985 <br />T0: S n Mowry ~~^^~ <br />FROM: Jim Pendleton <br />RE: November 13, <br /> <br />from Leroy Black, Ute Engineering, Inc. <br />Mr. Black's letter states that the additional subsidence survey monuments <br />required at the Bear No. 3 Mine (U-8, U-10, U-11) have been installed. <br />However, the initial pre-subsidence survey preformed by Ute Engineering was <br />determined to be flawed. Mr. Black observes that the survey should be <br />completed, "weather permitting", November 25, 1985. <br />I recommend that you communicate to Bear Coal Company the absolute importance <br />of completing the pre-subsidence prior to any undermining of the newly <br />installed monuments: <br />Attachment <br />cc: Bob Liddle <br />/ph <br /> <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />