Laserfiche WebLink
iii iiiiiiiiiiiuiii <br />999 <br />- hECEIVED <br />JAN 15 1999 <br />_,.,,,..,, of wi~nerais ti<Geoiogy <br />January 12, 1999 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Subject: Battle Mountain Resources, Inc, -San Luis Project <br />DMG Permit No. M-88-112 <br />Monthly Response Status Report - December i 998 <br />Dear Mr. Dillie: <br />The following areas are part of our Response Plan and their status during the month of <br />December was as follows: <br />INTERIM MEASURES <br />The french drain and sump pump was in service all month collecting water and <br />returning it to the infiltration trench in the West Mine. The water was contained in <br />the french all month. <br />FIELD CHARACTERIZATION & HYDROLOGICAL EVALUATIONS <br />Mitchell Drilling Company, O'Keefe Drilling Company and Layne Western Drilling <br />Company are all on site drilling the wells as spelled out in the Response Plan. As the <br />wells are completed they are pump tested and sampled. To date 16 wells have been <br />completed. Please see attached sheet for well data and designation. <br />Sin erely, <br />~~~ <br />Ron Zu walt <br />Enclosures <br /> <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />