Laserfiche WebLink
Mountain Coo/ Company 1997 Annual Hydrology Report West E/k Mine <br />obtain samples. The bailer was rinsed with distilled water before and after each sample. Afrer <br />• rinsing, the bailer was gently lowered into the water column in the well. The sample was <br />obtained, striving to disturb the well water column as little as possible during sampling and <br />retrieval. Prior to measurement, instruments and equipment were rinsed with distilled water. <br />Field parameters were measured and the water sample was divided into the proper sample <br />bottles, sealed, cooled as appropriate, boxed, and delivered to the laboratory for analysis. In <br />some cases, samples may not be available since there was insufficient water for sampling. This <br />means that there was not enough water to fill the sample bottles, plus provide an additional 300 <br />to 500 ml of sample for rinsing and field parameter measurement. <br />• <br />• <br />3l -0 2.450 Page 1 rig [ Wa[er ng[neers <br />