Laserfiche WebLink
~ III IIIIIIIIIIIIIIII <br />Notice of Intent to Continue Mining Operations ^eI"CD <br />112c Construction Materials Annual Report REVD Y G <br />Permittee Name: Asphalt Gravel Products Inc ~ 1g98 <br />T <br />Permit No. M-7B-271 ~~ <br />3 <br />Operat ion Name: Garrett Pit Geo109y <br />Anniversary Date: October 30, 1998 mery(s& <br />p~hS~a~otM~ <br />Total: $550.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: 80 <br /> b. County where mine is located: C o n e j o s <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES ~NO <br /> <br /> Does this mine operate MORE or LESS than 180 days per year? MORE LESS <br />3. Does this mine have a phased reclamation plan? YES NO <br />q. Total acres affected during the report year:+ 0 <br />5.- Total acres reclaimed for Lhe report year:* - -- ~ - - 0 <br />6. Total number of acres in topsoil replacement stage: 0 <br /> a. Average thickness of topsoil replaced: <br />7. Total number of acres seeded: 0 <br /> a. List species seeded & seeding rate for report year on bac <br />B. For non-phased operations provide dates extraction ceased: N/A <br /> a. Date reclamation began: N/A <br />9. The type and approximate quantity of fertilizers, organic mater ial or soil <br /> conditioners used for the report year:* N/A <br />10. Estimated total acres to be affected in the next report year:+ 0.5 A <br />11. COMMENTS: No mining activity for report year; sales from stockpiled <br /> processed materials of approximately 5,000 tons. No new map <br /> submitted. <br />+ Please show the location of the acreage for items 4 - 6 on your map++. Indicate <br />the phases of the reclamation which have been completed, correlated with your timetable <br />For phased operations show dates extraction ceased and dates reclamation began. <br />'+ NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 through <br />6, then a new map is unnecessary. However, this must be stated above. <br />Signature: Date: October 29. 1998 <br />Please typ r print current contact name, mailing address, and phone number below: <br />Contact ame: Jim M. Burchett Phone: (719 ) 589-5103 <br />Company: Southway Construction Co.,Inc.FAX N0: (719 ) 589-5522 <br />Address: 117 White Pine Drive <br />Alamosa, Colorado 81101 <br />Federal Tax ID No. or Social Security No.: <br />