My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP29578
DRMS
>
Back File Migration
>
Report
>
REP29578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:00:01 AM
Creation date
11/27/2007 5:22:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977023
IBM Index Class Name
Report
Doc Date
1/21/1988
Doc Name
ANNUAL REPORT PN M-77-023 GUNNISON PIT
From
VALCO
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^r • III IIIIII'lllllllll <br />999 <br />January 19, 1988 <br />VALCO, INC. <br />GUNNISON CONCRETE DIVISION <br />P. O. BOX 837 <br />GUNNISON, COLORADO 81230 <br />(303) 641-0951 <br />~~~ ~ ia~~~~' <br />JAN 21 1988 <br />Mined Land Reclamation Division MIND LAI+lU <br />State of Colorado RECLAMAYIntJ i5lVif?IC11~ <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, CO. 80203 <br />RE: Annual Report- Permit ~i M-77-023 Valco, Inc. Gunnison Pit <br />Please accept this as our Annual Report for the above named permi4 <br />for the mining period of January 23, 1987 thru January 23, 1988. <br />A check for $350 for the Annual Fee is enclosed. <br />1. Mining occured in the northeast portion of Track A, <br />Phase One, on the east half of the property. Approx <br />2.5 acres were mined. <br />2. No acres were reclaimed. <br />3. No acres are in various stages of reclamation, because <br />we are still mining in phase one. <br />4. No new vegetation was planted. <br />5. No new fertilizer or soil conditioners were used. <br />6. Mining is continuing in this phase and the only reclama= <br />tion that has occured is the vegetation of the topsoil <br />piles. <br />7. ble are estimating we will mine about three acres, more <br />or less, in the east-northeast section of Phase One in <br />the coming year, depending upon the business demand. <br />8. Effective date of this information is January 19, 1987. <br />~~ ~ <br />Geor e R. Gr/~ <br />9 99 <br />General Manager <br />Encls: Check ~ map <br />ROCKY FORD PUEBLO CANON CITY <br />LAMAR <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.