Laserfiche WebLink
Bowie Resources Limited <br />Bowie No. 2 Mine <br />2003 Annual Hydrology Report <br />1NITS <br />C-4 <br />North Fork -Drainage System <br />Elevation - 5930 <br />Summary Information <br />Baseline <br />Min Ave Max <br />Surface Water <br />Initiated 6/29/2000 6/29/2000 6/292000 6/29/2000 <br />Activated <br />Date 11/19/2003 9/15/2003 622/2003 5/2 y2003 <br />Operation <br />Min Ave Max <br />Flow GPM 0 0 0 0 0 0 0 0 0 0 <br />FieldComment D Dry D D <br />ph su <br />Conductivi umhos/cm <br />Temperature Celsius <br /> <br />I/ 1I <br />u <br />The C-4 monitoring point is a culvert under the Union Pa~c Railroad. It is /ocated 600 (eet southwest of the intersection with old Hwy 133. <br />Baseline Information Collection initiated on 6/29/00 and not yet considered complete. <br />Point C-4 has not been influenced by mining. <br />Figure No. 87 <br />The area of concern for monitoring point C-4 has not been aNected by the mining operation. Therefore, all recorded <br />monitoring events are considered Baseline. <br />