Laserfiche WebLink
Bowie Resources Limited Surface Water <br />Bowie No. 2 Mine <br />2003 Annual Hydrology Report C-1 <br />North Fork -Drainage System • <br />Elevation - 5910 <br />Summary Information <br />Initiated 612912000 6129/2000 6/29/2000 6129/2000 <br />Activated <br />Date 11/79/2003 9115!2003 6/22/2003 5/21/2003 <br />Ete~ <br />.P.arameers Baseline Operation <br />UNITS Min Ave Max Min Ave Max <br />Flow GPM 0 0 0 0 0 0 0 0 0 0 <br />FieldCommeM D D D Dry <br />ph su <br />Conductivi umhos/cm <br />Temperature Celsius <br />aramet UNITS <br />Bicarbonate mg/L <br />Chloride mglL <br />Conductivity umhos/cm <br />Hardness m IL <br />Nitrate-Nitrite m /L <br />Oil and Grease mg/L <br />pH su <br />Phosphate <br />ResidueFilterable (TDS) <br />ResidueNonFilterable (TSS mg/L <br />mg1L <br />m /L <br />SAR <br />Sulfate m /L <br />Aluminum mg/L <br />Arsenic m 2 <br />Cadmium mglL <br />Callum mg/L <br />Copper mg/L <br />Iron (Total) mg/L <br />Lead mglL <br />Ma nesium m 2 <br />Manganese (Total) mg/L <br />Mercu mg/L <br />Mo ebdenum mg1L <br />Selenium mglL <br />Sodium mg/L <br />Zinc m /L <br />The area of concern far monitoring point Gf has not been affected by the mining operation. There/ore, all recorded <br />monitodng events are considered Baseline. <br />The C-1 monitoring point is a Culvert under the Union Pa~c Railroad. It is located 40 /eet northeast of the Terror Creek Loadout <br />mainline switch. <br />• <br />Baseline In/ortnation Collection initiated on 6/29/00 and not yet wnsitlered complete. <br />Point C-1 has not been influenced Dy mining. FIgUrB NO. 84 <br />