My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP29315
DRMS
>
Back File Migration
>
Report
>
REP29315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:59:48 PM
Creation date
11/27/2007 5:16:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Report
Doc Date
2/2/1995
Doc Name
1994 PROJECT STATUS & ANNUAL PLAN OF DEVELOPMENT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`-~rr~ ~- <br />6.1 Hvdrologv Monitoring <br />6.1.1 <br />The monitoring plan <br />N's m r~lfTig operation. Based <br />on results of initial 1991-1994 mining and monitoring, future operations/monitoring will <br />be evaluated. Monitoring activity in 1990-1994 exceeded the required BLM, EPA and <br />State DMG requirements for initial cavities. The water year is generally recognized as <br />October-September for reporting, however, in 1993 and 1994 significant results were <br />noted and reported in November-December. Figure 5-1 illustrates location of monitoring <br />wells completed in 1989-94. <br />6.1.2 Sco[~e <br />Hydrology monitoring concentrates on ground water monitoring as there are no perennial <br />• streams or springs located on the sodium leases. HRS Water Consultants were <br />contracted to project the crone of depression based on current plant location and projected <br />water well pumpage raters. An evaluation of possible springs on the lease and pumpage <br />effected areas was conducted in 1990. No spri~~gs were found within the cone of <br />depression based on a review of USGS and BLM~urvey results, and field inventory. <br />Therefore there are no spring monitoring results. <br />6.1.3 Stream Gauging Stations <br />As required by the ROD, (project Record of Decision from EIS) , WRN contracted for <br />surtace water monitoring of water quality and quantity, upstream and downstream of the <br /> <br />45 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.