Laserfiche WebLink
sprinkler system to increase evapotransportation. Fences were installed around mud pits <br />at production wells 93-3V and 93-4H. Mud pits will remain open throughout the <br />production well life to act as a temporary spill containment structure. <br />4.2 Off-Site Facilities <br />P <br />4.2.1 Railcar Loadout at Lacv Station <br />A railcar loadout facility at Lacy Station, approximately five miles west of Rifle, Colorado, <br />is utilized by a shipping contractor for railcar loading and shipping. In 1994, this facility <br />was utilized for handling a majority of the product. <br />4.2.2 COfDOrate Office <br />• WRN will report to North American Chemical Co. with corporate offices in Overland <br />Park, Kansas. NaTec maintains corporate offices in Houston ,Texas. <br />4.3 New Findings or Developments <br />4.3.1 1994 Operations Result <br />1994 mining activities occurred over the entire year. Other than planned shutdowns for <br />maintenance, the plant and mine ran continuously. <br />. 22 <br />.~"'~; <br />