Laserfiche WebLink
<br />• <br />3.2 Schedule <br />3.2.1 1994 Planned Production and Activities <br />The annual plan for 1994 proposed the following: <br />a. Continued penetration into the traditional bicarb market. <br />b. Continued development of the Flue Gas Desulfurization (FDG) applications <br />c. Production of approximately 73,500 tons in 1994. <br />d. Continuous production with downtime scheduled for plant maintenance, <br />cavity surveys, etc. <br />e. Process modifications planned to improve the crystallization operation. <br />f. Begin mining cavity #3, with longer lateral section (2000') than previous <br />cavities. <br />g. Drill a sonar access well over cavity #3. <br />n <br />U <br />3.2.2 Actual 1994 Production and Activities <br />The following was accomplished in 1994. <br />a. Two production wells for the development of cavity #3 were drilled during <br />the early part of 1994. The two wells making up cavity #: are WRNM 26-93-1V (the <br />vertical recovery well) and WRNM 26-93-2H (the horizontal injection well). The horizontal <br />well was drilled with a 2000' lateral section to expose 339E more formation than cavity #2 <br />and 100% more than cavity #1. <br />b. During the summer a sonar access well was drilled into cavity #3 near the <br />n <br />U <br />mid point of the 1000' ext~:nsion. By directionally drilling the well toward the borehole, <br />10 <br />~~. ~- <br />