Laserfiche WebLink
During 2000 development of longwall panel gate roads 11, 12 and 13 continued throughout the <br />year. I,ongwall operations continued to finish the panel between 20 and 21 North. In early <br />February the longwall was relocated to the panel between 6 and 7 North. In July the longwall was <br />relocated to the panel between 7 and 8 North. In November the longwall was relocated to the panel <br />between 11 and 12 North. The panel between 8 and 9 North was skipped due to ground and gas <br />conditions. Subsidence monitoring of the permit area was preformed during the monthly water <br />monitoring. No visible indication of recent mass movement was apparent and no new mass <br />movement features were noted during the inspection <br />During 2001 development of longwall panel gate roads 13, 14, I5, 16, 17 continued throughout the <br />year. Longwall operations continued to finish the panel between 11 and 12 North. In early May <br />the longwall was relocated to the panel between 12 and 13 North. In October the longwall was <br />relocated to the panel between 13 and 14 North. Subsidence monitoring of the permit area was <br />preformed during the monthly water monitoring. No visible indication of recent mass movement <br />was apparent and no new mass movement features were noted during the inspection <br />Sincerely, <br />~~'~~ <br />Mark Milner <br />Environmental Coordinator <br />3 <br />XB~w <br />