My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-04-12_REPORT - M1995023
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1995023
>
2000-04-12_REPORT - M1995023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2021 9:16:34 PM
Creation date
11/27/2007 5:15:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995023
IBM Index Class Name
Report
Doc Date
4/12/2000
Doc Name
ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> " I <br /> ANNUAL REPORT <br /> INSTRUCTIONS <br /> According to C.R.S. 34-32-116(3), and C.R.S. 34-32.5-1 16(3)(a). on the anniversary date of the permit each year, <br /> the operator shall submit a report and a map showing the extent of current disturbances to affected land, <br /> reclamation accomplished to date and during the preceding year, new disturbances that are anticipated to occur <br /> during the upcoming year, and reclamation that will be performed during the upcoming year. Please attach such <br /> a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes <br /> the above elements may suffice for a written report.) <br /> If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br /> provrd. with the Annual Report the following information as required by 2 CCR 407-1. 407-4, and Rules <br /> 1.13.7(1)(a): <br /> (i) the condition of the operation at the time of cessation; <br /> (ii) what specific measures have been and will be implemented to comply with reclamation, performance <br /> standards and Environmental Protection Plan requirements, if they are part of your approved application; and <br /> (iii) plans for resumption of mining operations. <br /> Please provide the additional following information with your Annual Report, as applicable: <br /> (a) Per the requirements of 2 CCR 407-1,407-4, and Rules 1.15(1), provide an updated statement <br /> regarding the sufficiency of the value of the Financial Warranty, specifically: <br /> (i) Per the requirements of 2 CCR 407-1,407-4, and Rules 1.15(1)(a), provide an updated <br /> statement regarding the sufficiency of the value of the financial warranty. Specifically, <br /> irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage <br /> credit, and first priority liens on project related fixtures. <br /> (ii) Per the requirements of 2 CCR 407-1,407-4, and Rules 1.15(1)(b), permits secured with a <br /> Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br /> independent appraiser, indicating any changes in property value, and a statement summarizing <br /> any circumstances which may affect the adequacy of the Deed of Trust, or Security agreement,_) <br /> value of t tl a property su )ect to eiNer of these instruments. The report shall also provide <br /> proof that there are no past-due property taxes. <br /> (i) Per the requirements of 2 CCR 407-1. 407-4, and Rules 4.7(3), permits secured with an <br /> Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form <br /> of a balance sheet, certified by a Certified Public Accountant,demonstrating that the Letter of <br /> Credit does not exceed ten percent(10%) of the bank's capital surplus accounts. <br /> (ii) Per the requirements of 2 CCR 407-1, 407-4. and Rules 4.9.3(c), permits secured by a First <br /> Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br /> detail to fully describe the condition, value, and location of all pledged fixtures and equipment. <br /> (b)Per the requirements of 2 CCR 407-1. 407-4, and Rules 1.15(1)(c), all monitoring information <br /> required as pan of the approved permit application, to include the Environmental Protection Plan. (Please <br /> note that if you are not a Designated Mining Operation, you will not have an Environmental Protection <br /> Plan as part of your approved permit.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.