Laserfiche WebLink
' drawings. All of the extrusion welds were vacuum tested for water tightness prior to acceptance by <br />the SRK inspector. <br />5.0 PUMP HOUSE <br />' The return water pump house, pumps and ancillary work were constructed by CONEL. The work <br />' was periodically observed by SR1C. Testing and commissioning of the system was performed by <br />CONEL. <br />' 6.0 MISCELLANEOUS WORK <br />Fencing, power lines, pipelines, control valves and the miscellaneous pipework for protection and <br />operations of the impoundment were installed and inspected by or under the direction of BMG. <br />r <br />~ z~ <br />