Laserfiche WebLink
Deremo Snyder Annual Report <br />2001-2002 <br />The petroleum contaminated soils (PCS) treatment area was tilled during the summer <br />months of 2001. No other reclamation activity occurred at the site during the past year. <br />Umetco recently applied for a partial release of the permitted area. <br />During the coming year Umetco expects that the PCS will be either treated during the <br />summer months, or the treatment area will be reclaimed. Re-seeding of some of the mine <br />spoils piles is also expected to occur. <br />A site map is not included because there have been no significant changes at the site. <br />