Laserfiche WebLink
Rule 2.04.13(1)(a) The name and address of the permittee and permit number; <br />The report is in compliance with this rule. The name of the permittee and the address aze entered on the <br />Division report form and in the cover letter. <br />Rule 2.04.13(I)(b) Location and number of acres disturbed during that year; <br />The report is incompliance with this rule. 1.5 acres were reported as disturbed during 2006. <br />Rule 2.04.13(1)(c) Location and number of acres bacl~lled and graded during that year; <br />The report is in compliance with this rule. None were backfilled and graded. <br />Rule 2.04.13(1)(d) Location and number acres topsoiled during that year; <br />The report is in compliance with this rule. None were topsoiled. <br />Rule 2.04.13(1)(e) The species, location and number of acres of vegetation planted during that year, <br />including any augmented seeding or cultural practices; and <br />The report is in compliance with this rule. None were vegetated. <br />Rule 2.04.13(1)(f) Location, number of acres and date of planting for all previously revegetated areas. <br />There have been a number of disturbed azeas where backfilling, grading, and seeding has been <br />accomplished. To date, the operator has chosen not to report them, as most involve long-term facilities <br />where surface azeas aze subject to re-disturbance due to maintenance activities. There is a list of such azeas <br />provided in the report that identifies such areas by name. Maps that were developed as a part of MR 06- <br />211 and TR OS-51 aze referenced. <br />Rule 2.04.13(2) The permittee may provide additional monitoring information as required by the <br />approved permit. <br />The operator submitted the Division reclamation report as the ARR this year, with a brief cover letter and <br />Table 1. Cumulative total acres backfilled and graded, topsoiled, and seeded are reported as none on the <br />form, but a number of disturbed azeas have been reported as reclaimed. See the explanation above. The <br />review letter advised that the time of seeding needs to be established to monitor the required -iability <br />period. <br />files: electronic: Reports, ARR C1982-056 <br />Permit: C1982-056 (Foidel Creek Mine) <br />C:\bgw\My Documents\Foidel CreekWRRs\2006 ARR Review.doc <br />2006 ARR Review, C-1982-056, page 2 of 2 pages <br />