Laserfiche WebLink
spring. <br />Contouring the piles as they are built is important in order to <br />achieve the configuration outlined in the reclamation plan. This <br />will allow the placement of clay and topsoil to follow in a <br />timely manner and eliminate the possibility of double handling. <br />The mining sequence can be followed by using the overlays and the <br />yearly calculations together to deterv~ine what goes where and <br />when. The overlays are a helpful tool to determine where the <br />operation should be at any time during the 25 year event. <br />Berg Consulting <br />Marvin L. Berg, PE <br /> <br /> <br />