Laserfiche WebLink
-; <br />ATTACHMENT FOR THE 192 ANNUAL REPORT <br />FOR THE SNYDER QUARRY - M-77-210 <br />CASTLE CONCRETE COMPANY <br />MAP: No map is provided in this year's annual report because the <br />changes from the previous year are simply too minor to show on a map. <br />1990/91 RECLAMATION: In addition to the reclamation work performed <br />under the corrective action plan for the roadside disturbances and the <br />disturbances in Williams Canyon, about 1 more acre of bench area in the <br />quarry was reclaimed. There are now three benches in Phase I that are <br />under various stages of revegetation. Part of the fourth bench is being <br />backfilled. <br />FUTURE ACTIVITY: The lower portions of Phase I are continuing to be <br />pushed westward to enlarge the bottom of the pit. At the same time the <br />bottom of the pit is being lowered. Therefore, Phase II may not be <br />entered for twa or three more years. <br />