Laserfiche WebLink
<br />Basin Resources, Inc. <br />Quarterly Inspection Report <br />Coal Waste Banks <br />Rules 4.09(11) and 4.10 (2)(2) <br />Mine: <br />Date: <br />Waste Bank No: <br />General Description or Reference to Site Plan: <br />^ Golden Eagle -Exhibit 17, pages 2.05-19, 2.05-25(a) through (c) <br />~` New Elk - E.chibi[ 30, pages 2.05-27 through 2.0574 (~, <br />Activity During Inspection: <br />^ Removal of Topsoil or Organic Matter ^ Ptacement of Underdrain(s)• <br />^ installation of Surface Drainage Systems ^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction and/or distharge, <br />integrity of 100-year 24-hour appurtenant drainage struc[ures, eIvi_dence of posi[ive drainage. <br />/' Z 1.~~-,~ 1] ram'-. ~ ~? c~ K~ Ii i a.c~ t/i~-~i ' '', /, <br />s~ ~ j s ~v~" ~ s LGr~ a~'~1 ~`1 <br />7y~ /~ _r~"~~ <br />Observatioat of Fill Construcsioa: Include description of material, compac[ion, lifr [hicicnesses, slopes of sides <br />and faces, cotutrucrion methodology. - " G r_~, <br />Page I of 2 <br />