Laserfiche WebLink
<br />The initial slope settlement appears to have stabilized <br />and, therefore, it is proposed that the slope stability monuments <br />are surveyed annually unless visible instability is observed or <br />more frequent surveying is requested by the CMLRD. <br />V. CONCLUSIONS <br />Underground Development has progressed beneath Foidel <br />Creek without any measurable surface subsidence taking place. The <br />spoils slopes above the mine facilities are currently stable at <br />a 2H:1V slope. <br /> <br />L <br />