Laserfiche WebLink
Bowie Resources Limited <br /> Table 4 <br />Bowie No. 1 Mine <br />2001 Annu01 Hydrology Report Monitonna Point Descnotions <br /> <br /> North irnrk+~fiat~tum Grourithvater Mrrrttmri'rrg ~l+eJrs <br />Monitoring Point Table Number 10 0 Chart Included? <br />MW01 Monitoring Well 1 Located in <br />Monitoring wells MW-1, MW-2, and W-3 are located at the coal stockpile/truck durnp/train loadout in a Valley Floor <br />area and were ddlled during September, 1982, to determine the essen0al hydrologic functions of the <br />North Fork alluvial valley floor. Two of the wells, MW-2 and MW-3 have since been determined to be <br />installed in areas which are no longer classified as alluvial valley floor (TR-13). <br />Monitoring Point Table Number 11 ^Q Chart Included? <br />MW02 Monitoring Well2 Located in <br />Mondoring wells MW-1, MW-2, and W-3 are located at the coal stockpile/truck durnp/train loadout in a Valley Floor <br />area and were drilled during September, 1982, to determine the essential hydrologic functions of the <br />North Fork alluvial valley floor. Twn of the wells, MW-2 and MW-3 have since been determined to be <br />installed in areas which are no longer classified as alluvial valley floor (TR-13). <br />Monitoring Point Table Number 12 ~ Chart Included? <br />MW03 Monitoring Well3 Located in <br />Monitoring wells MW-1, MW-2, and W-3 are located at the coal stockpile/truck durnp/train loadout in a Valley Floor <br />area and were ddlled during September, 1982, to determine the essential hydrologic functions of the <br />North Fork alluvial valley floor. Two of the wells, MW-2 and MW-3 have since been determined to be <br />installed in areas which are no longer classified as alluvial valley floor (TR-13). <br />Page 13 <br />