Laserfiche WebLink
2) Backfilling, final grading and topsoil replacement has finished on the south central <br />portion of the permit area. The small area in the southwest corner that required <br />backfilling to 2H:1V has been completed. Actual slopes are slightly milder than 2H:1V. <br />See the map. Grading and topsoiling of this area will be accomplished in the fall <br />according to the approved reclamation plan. All water containment berms have been <br />inspected and are found to be intact. <br />(3) For the upcoming year, new mining is possible on the east section of the permit <br />area. Reclamation will continue in the south west corner of the permit area to achieve <br />final grade. <br />(4) The reclaimed slope in the south central part of the permit area will be reseeded <br />and the remaining slope in the southwest corner will be graded, topsoiled and seeded. <br />(5) The current contact for this operation is: <br />Jason Burkey <br />B&B Excavating, Inc. <br />P.O. Box 1729 <br />Edwards, Colorado 81632 <br />Phone # (970) 926-3311 <br />Tax I.D. <br />Note: No revised map has been included since no changes have occurred since last <br />year, <br />Enclosed is a check for $688 for the annual fee. <br />Sincerely, <br />Greg Lewicki, P. E. <br />Greg Lewicki and Associates <br />cc: Jason Burkey <br />